Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,537
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0629 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,200 | $1,500 | Not Implemented |
UD0629 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,907 | $0 | Implemented |
UD0629 # 08 Y:2001 | 08 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,128 | $0 | Not Implemented |
UD0629 # 09 Y:2001 | 09 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $982 | $250 | Not Implemented |
UD0629 # 10 Y:2001 | 10 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $628 | $300 | Not Implemented |
GT0718 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,000 | $0 | n/a |
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
GT0718 # 03 Y:2001 | 03 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $645 | $0 | n/a |
GT0718 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $1,625 | $7,000 | n/a |
GT0718 # 05 Y:2001 | 05 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $35,705 | $3,500 | n/a |
GT0718 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $99,000 | $80,000 | n/a |
GT0718 # 07 Y:2001 | 07 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,400 | $30,000 | n/a |
GT0718 # 08 Y:2001 | 08 | 2001 | USE WATER-BASED ADHESIVES | $73,300 | $20,000 | n/a |
GT0718 # 09 Y:2001 | 09 | 2001 | COMBINE UTILITY METERS | $127 | $0 | n/a |
WV0218 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $535 | $188 | Not Implemented |
WV0218 # 02 Y:2001 | 02 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,768 | $13,800 | Implemented |
WV0218 # 03 Y:2001 | 03 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,519 | $1,362 | Implemented |
WV0218 # 04 Y:2001 | 04 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $121 | $60 | Implemented |
WV0218 # 05 Y:2001 | 05 | 2001 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $2,714 | $2,520 | Not Implemented |
WV0218 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,713 | $1,440 | Implemented |
WV0218 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $1,985 | $276 | Implemented |
WV0218 # 08 Y:2001 | 08 | 2001 | INSULATE BARE EQUIPMENT | $3,625 | $730 | Implemented |
WV0218 # 09 Y:2001 | 09 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,088 | $1,200 | Implemented |
WV0218 # 10 Y:2001 | 10 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,940 | $0 | Not Implemented |
WV0218 # 11 Y:2001 | 11 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $18,480 | $9,000 | Implemented |