Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0456 # 10 Y:2012 | 10 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,050 | $200 | Implemented |
SD0456 # 09 Y:2012 | 09 | 2012 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,556 | $7,320 | Not Implemented |
SD0456 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,790 | $600 | Implemented |
SD0456 # 01 Y:2012 | 01 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,105 | $79,350 | Not Implemented |
SD0456 # 02 Y:2012 | 02 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,534 | $2,700 | Implemented |
SD0456 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,264 | $10,398 | Implemented |
SD0456 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $5,372 | $4,900 | Not Implemented |
SD0456 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,297 | $500 | Implemented |
SD0456 # 06 Y:2012 | 06 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,322 | $7,503 | Implemented |
SD0456 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,827 | $200 | Implemented |
WV0455 # 08 Y:2012 | 08 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,918 | $4,850 | Not Implemented |
WV0455 # 13 Y:2012 | 13 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $1,157 | $841 | Implemented |
WV0455 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,863 | $1,706 | Implemented |
WV0455 # 11 Y:2012 | 11 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,644 | $1,000 | Implemented |
WV0455 # 17 Y:2012 | 17 | 2012 | USE PHOTOCELL CONTROLS | $645 | $620 | Implemented |
WV0455 # 16 Y:2012 | 16 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $712 | $620 | Implemented |
WV0455 # 15 Y:2012 | 15 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $845 | $70 | Implemented |
WV0455 # 18 Y:2012 | 18 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $377 | $500 | Implemented |
WV0455 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,374 | $4,330 | Not Implemented |
WV0455 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,600 | $3,294 | Implemented |
WV0455 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $3,160 | $5,680 | Not Implemented |
WV0455 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $6,023 | $2,440 | Implemented |
WV0455 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,439 | $5,745 | Implemented |
WV0455 # 02 Y:2012 | 02 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $6,540 | $12,520 | Not Implemented |
WV0455 # 01 Y:2012 | 01 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,670 | $16,140 | Not Implemented |