IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,066

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0041 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $104 Implemented
ST0041 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $343 $0 Implemented
ST0041 # 07 Y:1985 07 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,510 $537 Implemented
ST0036 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,064 $56 Implemented
ST0036 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,767 $0 Implemented
ST0036 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $197 $340 Implemented
ST0036 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $420 $200 Implemented
ST0036 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $320 $160 Implemented
ST0036 # 08 Y:1985 08 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $792 $1,680 Implemented
ST0038 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,407 $660 Implemented
ST0038 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,466 $48 Implemented
ST0038 # 04 Y:1985 04 1985 USE COMPRESSOR AIR FILTERS $1,856 $800 Implemented
ST0038 # 05 Y:1985 05 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,009 $0 Implemented
AT0017 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $146 $0 Implemented
AT0017 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $6,114 $0 Implemented
CO0032 # 02 Y:1985 02 1985 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $816 $2,000 Implemented
CO0032 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,972 $3,600 Implemented
CO0032 # 06 Y:1985 06 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $596 $1,500 Implemented
CO0032 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $1,500 Implemented
OK0176 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $428 $650 Implemented
OK0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $12 Implemented
OK0176 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $240 Implemented
OK0176 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $71 $145 Implemented
OK0176 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18 $60 Implemented
CO0022 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $812 Implemented