Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
507
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0203 # 02 Y:2024 | 02 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $55,966 | $1,300 | n/a |
IP0203 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,015 | $1,072 | n/a |
IP0203 # 05 Y:2024 | 05 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $64,223 | $20,000 | n/a |
IP0203 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,564 | $44 | n/a |
IP0203 # 01 Y:2024 | 01 | 2024 | USE AUTOMATIC FLOW CONTROL | $56,666 | $700 | n/a |
IP0203 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,835 | $1,480 | n/a |
UL2415 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,401 | $2,438 | n/a |
UL2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,257 | $2,700 | n/a |
UL2415 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,863 | $758,879 | n/a |
UL2415 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,820 | $0 | n/a |
UL2415 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $28,874 | $11,700 | n/a |
UL2415 # 03 Y:2024 | 03 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $62,771 | $58,367 | n/a |
IP0197 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,370 | $13,000 | n/a |
IP0197 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,867 | $18,107 | n/a |
IP0197 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,000 | $1,506 | n/a |
IP0197 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,662 | $320 | n/a |
IP0197 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $33,478 | $697 | n/a |
IP0196 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,499 | $2,975 | n/a |
IP0196 # 01 Y:2024 | 01 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $507 | $0 | n/a |
IP0196 # 02 Y:2024 | 02 | 2024 | MODIFY STARTUP/SHUTDOWN TIMES | $1,880 | $40 | n/a |
IP0196 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,126 | $42 | n/a |
IP0196 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,327 | $2,497 | n/a |
IP0196 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $563 | $520 | n/a |
IP0189 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,822 | $0 | Implemented |
IP0189 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,852 | $325 | Implemented |