IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0564 # 01 Y:2004 01 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $20,000 $0 Not Implemented
MA0564 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,419 $10,531 Not Implemented
MA0564 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $3,226 Not Implemented
MA0564 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $168 $75 Not Implemented
MA0564 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $548 Implemented
ME0282 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,760 $8,904 Not Implemented
ME0282 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $12,262 $1,000 Implemented
ME0282 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $80,666 $36,000 Implemented
ME0282 # 04 Y:2000 04 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,181 $4,360 Not Implemented
ME0282 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,228 $250 Implemented
ME0272 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $11,434 $2,159 Implemented
ME0272 # 04 Y:1999 04 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,306 $450 Implemented
ME0272 # 08 Y:1999 08 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,172 $5,760 Implemented
ME0272 # 09 Y:1999 09 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,760 $7,122 Implemented
ME0272 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,227 $850 Not Implemented
ME0272 # 11 Y:1999 11 1999 INSULATE BARE EQUIPMENT $1,899 $1,260 Implemented
ME0272 # 10 Y:1999 10 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,141 $7,579 Not Implemented
ME0272 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $5,265 $0 Implemented
ME0272 # 01 Y:1999 01 1999 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $19,520 $4,860 Not Implemented
ME0272 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,306 $500 Not Implemented
ME0272 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,056 $22,438 Not Implemented
ME0243 # 02 Y:1998 02 1998 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,765 $3,000 Implemented
ME0243 # 05 Y:1998 05 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,145 $0 Not Implemented
ME0243 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $972 $1,000 Implemented
ME0243 # 04 Y:1998 04 1998 PAY BILLS ON TIME TO AVOID LATE FEES $1,194 $0 Implemented