Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0592 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $56,494 | $73,748 | Implemented |
MA0592 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,789 | $0 | Implemented |
MA0592 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,861 | $138,775 | Not Implemented |
MA0592 # 01 Y:2006 | 01 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $74,191 | $368,500 | Not Implemented |
MA0592 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,338 | $3,295 | Implemented |
MA0455 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,122 | $8,000 | Not Implemented |
MA0455 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,701 | $16,000 | Not Implemented |
MA0455 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,310 | $50,000 | Not Implemented |
MA0455 # 02 Y:1999 | 02 | 1999 | USE MINIMUM SAFE OVEN VENTILATION | $33,134 | $16,250 | Not Implemented |
MA0455 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $93,496 | $240,000 | Not Implemented |
MA0386 # 01 Y:1997 | 01 | 1997 | USE OTHER METHODS FOR NEUTRALIZATION | $194,188 | $908,000 | Not Implemented |
MA0386 # 06 Y:1997 | 06 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,837 | $3,215 | Not Implemented |
MA0386 # 05 Y:1997 | 05 | 1997 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $7,800 | $11,240 | Not Implemented |
MA0386 # 04 Y:1997 | 04 | 1997 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,103 | $20,180 | Not Implemented |
MA0386 # 03 Y:1997 | 03 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $15,024 | $22,219 | Not Implemented |
MA0386 # 02 Y:1997 | 02 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $42,000 | $0 | Not Implemented |
MA0180 # 03 Y:1990 | 03 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,957 | $6,200 | Not Implemented |
MA0180 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,604 | $334 | Implemented |
MA0180 # 01 Y:1990 | 01 | 1990 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,523 | $5,750 | Implemented |
MA0042 # 06 Y:1985 | 06 | 1985 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $9,886 | $0 | Implemented |
MA0042 # 05 Y:1985 | 05 | 1985 | IMPROVE LUBRICATION PRACTICES | $194 | $147 | Not Implemented |
MA0042 # 04 Y:1985 | 04 | 1985 | OPTIMIZE PLANT POWER FACTOR | $9,522 | $13,420 | Implemented |
MA0042 # 03 Y:1985 | 03 | 1985 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $326 | $280 | Implemented |
MA0042 # 02 Y:1985 | 02 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,060 | $24,450 | Implemented |
MA0042 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,464 | $200 | Implemented |