IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0652 # 10 Y:2023 10 2023 INSULATE BARE EQUIPMENT $506 $166 Implemented
WV0652 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,118 $7,210 Implemented
WV0652 # 04 Y:2023 04 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,975 $1,500 Implemented
WV0652 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,967 $2,160 Implemented
WV0652 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $22,798 $1,500 Implemented
WV0652 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,902 $2,750 Implemented
WV0652 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,958 $210,200 Not Implemented
WV0652 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $193,156 $160,000 Not Implemented
WV0652 # 05 Y:2023 05 2023 DEVELOP A REPAIR/REPLACE POLICY $13,792 $1,942 Implemented
WV0652 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $8,659 $22,700 Not Implemented
WV0636 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,927 $2,021 Implemented
WV0636 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,625 $18,739 Implemented
WV0636 # 08 Y:2022 08 2022 DEVELOP A REPAIR/REPLACE POLICY $217 $598 Implemented
WV0636 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,868 $465 Implemented
WV0636 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $670 $78 Implemented
WV0636 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,943 $7,374 Not Implemented
WV0636 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,183 $4,755 Not Implemented
WV0636 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $299 $465 Implemented
WV0636 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,546 $5,490 Not Implemented
WV0606 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,253 $314 Implemented
WV0606 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $9,895 $1,511 Not Implemented
WV0606 # 03 Y:2021 03 2021 DEVELOP A REPAIR/REPLACE POLICY $7,177 $729 Implemented
WV0606 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $173,936 $85,154 Not Implemented
WV0606 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $1,819 $595 Implemented
WV0606 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,685 $50 Implemented