IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

423

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0228 # 16 Y:2000 16 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $780 $750 Not Implemented
HO0228 # 17 Y:2000 17 2000 REDUCE OR ELIMINATE WASTE $8,250 $0 Implemented
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented
MA0454 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $667 $2,675 Not Implemented
MA0451 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,798 $50,000 Not Implemented
MA0451 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,519 $11,400 Not Implemented
MA0451 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,232 $7,614 Not Implemented
MA0451 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $3,400 Not Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
MA0451 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $985 Not Implemented
MA0451 # 07 Y:1999 07 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $500 $2,675 Not Implemented
MA0451 # 08 Y:1999 08 1999 ADJUST VENTS TO MINIMIZE ENERGY USE $228 $600 Not Implemented
HO0206 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,885 $30,185 Implemented
HO0206 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $4,615 $4,800 Not Implemented
HO0206 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $490 $4,370 Not Implemented
HO0206 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,390 $2,840 Implemented
HO0206 # 05 Y:1999 05 1999 MOVE PRODUCT USING MECHANICAL MEANS $1,560 $500 Implemented
HO0206 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,925 $5,600 Not Implemented
HO0206 # 07 Y:1999 07 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,800 $32,000 Implemented
HO0206 # 08 Y:1999 08 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $12,480 $35,677 Not Implemented
HO0206 # 09 Y:1999 09 1999 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $1,680 $3,200 Not Implemented
HO0206 # 10 Y:1999 10 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $4,155 $7,500 Implemented
HO0206 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,700 $30,000 Not Implemented
HO0206 # 12 Y:1999 12 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,403 $0 Implemented