IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,279

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0372 # 07 Y:2009 07 2009 UPGRADE OBSOLETE EQUIPMENT $5,567 $24,469 Not Implemented
SD0414 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,200 $14,950 Implemented
SD0414 # 02 Y:2009 02 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,396 $4,950 Not Implemented
SD0414 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,265 $5,257 Not Implemented
SD0414 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,637 $1,400 Implemented
SD0414 # 05 Y:2009 05 2009 INSTALL COMMON HEADER ON COMPRESSORS $10,623 $16,000 Implemented
SD0414 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,980 $26,700 Implemented
SD0410 # 01 Y:2008 01 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $824,374 $6,360,000 Not Implemented
SD0410 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,267 $0 Not Implemented
SD0410 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,992 $2,250 Implemented
SD0410 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,203 $56,758 Implemented
SD0410 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,826 $81,570 Not Implemented
SD0410 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,980 $0 Implemented
SD0410 # 07 Y:2008 07 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,978 $11,522 Not Implemented
SD0410 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,624 $24,471 Not Implemented
SD0410 # 09 Y:2008 09 2008 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $10,867 $500 Not Implemented
SD0410 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,041 $5,849 Not Implemented
SD0410 # 11 Y:2008 11 2008 INSTALL SKYLIGHTS $7,467 $22,980 Implemented
SD0410 # 12 Y:2008 12 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,185 $0 Not Implemented
SF0350 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $300 Implemented
SF0350 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $1,332 Implemented
SF0350 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $399 $492 Implemented
SF0350 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,126 $2,145 Not Implemented
SF0350 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $644 $4,267 Not Implemented
SF0350 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $9,827 Not Implemented