Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,497
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0588 # 06 Y:2012 | 06 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $631 | $4,131 | Not Implemented |
BS0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $272 | Implemented |
BS0004 # 02 Y:2012 | 02 | 2012 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,756 | $802 | Implemented |
BS0004 # 03 Y:2012 | 03 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,382 | $5,000 | Not Implemented |
BS0004 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,570 | $3,866 | Not Implemented |
BS0004 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $653 | $885 | Not Implemented |
BS0004 # 06 Y:2012 | 06 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,840 | $34 | Implemented |
BS0004 # 07 Y:2012 | 07 | 2012 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,240 | $119 | Not Implemented |
OR0585 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,836 | $7,417 | Not Implemented |
OR0585 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,690 | $2,000 | Not Implemented |
OR0585 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $1,776 | $500 | Not Implemented |
OR0585 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,028 | $2,305 | Implemented |
OR0585 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,171 | $1,000 | Not Implemented |
OR0585 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,942 | $1,000 | Not Implemented |
OR0585 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $13,449 | $24,282 | Not Implemented |
OR0585 # 08 Y:2012 | 08 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $16,379 | $16,379 | Not Implemented |
OR0585 # 09 Y:2012 | 09 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,083 | $47,838 | Not Implemented |
OR0585 # 10 Y:2012 | 10 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,580 | $0 | Not Implemented |
OR0585 # 11 Y:2012 | 11 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $12,086 | $16,390 | Implemented |
AM0616 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $28,900 | $630 | Not Implemented |
AM0616 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $24,000 | $27,300 | Not Implemented |
AM0616 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,820 | $390 | Not Implemented |
AM0616 # 04 Y:2012 | 04 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,980 | $0 | Not Implemented |
AM0616 # 05 Y:2012 | 05 | 2012 | USE SYNTHETIC LUBRICANT | $1,758 | $0 | Not Implemented |
AM0616 # 06 Y:2012 | 06 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,250 | $1,500 | Not Implemented |