Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,516
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0428 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $145,527 | $450,915 | Implemented |
NC0428 # 02 Y:2011 | 02 | 2011 | IMPROVE SPACE COMFORT CONDITIONING | $60,444 | $94,425 | Not Implemented |
NC0428 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,294 | $287,294 | Implemented |
NC0428 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,540 | $13,050 | Implemented |
NC0428 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $307 | $750 | Implemented |
NC0428 # 06 Y:2011 | 06 | 2011 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $7,730 | $47,000 | Not Implemented |
NC0428 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,910 | $25 | Implemented |
NC0428 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $681 | $100 | Implemented |
MZ0065 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,183 | $3,000 | Implemented |
MZ0065 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,106 | $2,120 | Implemented |
MZ0065 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $23,154 | $100,000 | Not Implemented |
MZ0065 # 04 Y:2011 | 04 | 2011 | USE SOLAR HEAT TO HEAT WATER | $300 | $2,500 | Implemented |
MZ0065 # 05 Y:2011 | 05 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,566 | $20,000 | Not Implemented |
MZ0065 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,073 | $1,500 | Implemented |
MZ0065 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,078 | $963 | Not Implemented |
MZ0065 # 08 Y:2011 | 08 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,240 | $0 | Not Implemented |
DL0071 # 01 Y:2011 | 01 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,220 | $600 | Implemented |
DL0071 # 02 Y:2011 | 02 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $650 | $0 | Implemented |
DL0071 # 03 Y:2011 | 03 | 2011 | REDUCE VENTILATION AIR | $4,520 | $0 | Implemented |
DL0071 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,600 | $5,300 | Not Implemented |
DL0071 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,970 | $2,390 | Not Implemented |
DL0071 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $430 | $180 | Not Implemented |
DL0071 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $100 | Implemented |
DL0071 # 08 Y:2011 | 08 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $590 | $2,484 | Implemented |
DL0071 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,800 | Not Implemented |