Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1912 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,541 | $0 | Implemented |
UK1912 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,123 | $3,378 | Not Implemented |
UK1912 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,744 | $8,695 | Not Implemented |
UK1912 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,487 | $2,150 | Implemented |
UK1912 # 07 Y:2019 | 07 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $16,009 | $41,650 | Not Implemented |
UK1912 # 08 Y:2019 | 08 | 2019 | INSULATE BARE EQUIPMENT | $90,133 | $6,406 | Not Implemented |
UK1805 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,688 | $18,720 | n/a |
UK1805 # 06 Y:2018 | 06 | 2018 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $495 | $1,250 | n/a |
UK1805 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $409 | $570 | n/a |
UK1805 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $2,317 | $3,179 | n/a |
UK1805 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $288 | $601 | n/a |
UK1805 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,147 | $1,316 | n/a |
UK1805 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $338 | $365 | n/a |
UK1805 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,637 | $750 | n/a |
UK1805 # 09 Y:2018 | 09 | 2018 | MOVE PRODUCT USING MECHANICAL MEANS | $27,500 | $19,000 | n/a |
UK1804 # 04 Y:2018 | 04 | 2018 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $195 | $238 | n/a |
UK1804 # 15 Y:2018 | 15 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $681 | $0 | n/a |
UK1804 # 07 Y:2018 | 07 | 2018 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,031 | $0 | n/a |
UK1804 # 13 Y:2018 | 13 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $24,936 | $117,925 | n/a |
UK1804 # 03 Y:2018 | 03 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,644 | $147 | n/a |
UK1804 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $459 | $1,500 | n/a |
UK1804 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,550 | $2,320 | n/a |
UK1804 # 09 Y:2018 | 09 | 2018 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,112 | $1,500 | n/a |
UK1804 # 11 Y:2018 | 11 | 2018 | INSULATE BARE EQUIPMENT | $1,814 | $704 | n/a |
UK1804 # 10 Y:2018 | 10 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,686 | $1,200 | n/a |