IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

318

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0044 # 11 Y:2024 11 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $158 $617 n/a
MU0044 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,256 $158,490 n/a
MU0042 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $11,930 $4,000 Not Implemented
MU0042 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,365 $25,500 Not Implemented
MU0042 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,317 $16,978 Not Implemented
MU0042 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $272 $69 Not Implemented
MU0042 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $574 $0 Not Implemented
MU0042 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $340 Implemented
MU0042 # 06 Y:2023 06 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $31,190 $89,468 Not Implemented
MU0020 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $188 $0 Not Implemented
MU0020 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $671 $0 Not Implemented
MU0020 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $226,577 $176,800 Implemented
MU0020 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,861 $320 Not Implemented
MU0020 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $19 $87 Not Implemented
MU0020 # 06 Y:2022 06 2022 USE PHOTOCELL CONTROLS $2,049 $761 Not Implemented
MU0020 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $321 $661 Not Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented
MU0020 # 09 Y:2022 09 2022 REDUCE HEAT GAIN BY WINDOW TINTING $1,907 $16,186 Not Implemented
MU0020 # 10 Y:2022 10 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $210,000 $0 Implemented
CW0114 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $1,244 $110 Not Implemented
CW0114 # 08 Y:2020 08 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,024 $10,137 Not Implemented
CW0114 # 06 Y:2020 06 2020 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,504 $0 Implemented
CW0114 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,314 $4,006 Not Implemented
CW0114 # 03 Y:2020 03 2020 INSTALL SKYLIGHTS $8,290 $40,875 Not Implemented
CW0114 # 02 Y:2020 02 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,400 $0 Implemented