IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0317 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,323 $0 Not Implemented
WV0317 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $23,795 $50,000 Not Implemented
WV0317 # 03 Y:2005 03 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,415 $5,677 Not Implemented
WV0317 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,217 $490 Implemented
WV0317 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,041 $60 Implemented
WV0317 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,531 $680 Implemented
WV0317 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,392 $855 Implemented
WV0317 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,285 $128 Implemented
WV0317 # 09 Y:2005 09 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,086 $2,295 Implemented
WV0317 # 10 Y:2005 10 2005 DEVELOP A REPAIR/REPLACE POLICY $1,435 $2,075 Not Implemented
WV0317 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $1,219 $2,680 Implemented
WV0317 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $761 $205 Implemented
WV0317 # 13 Y:2005 13 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $400 $240 Implemented
UD0718 # 01 Y:2005 01 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $409,000 $15,000 Not Implemented
UD0718 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,400 $62,900 Not Implemented
UD0718 # 03 Y:2005 03 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $64,584 $200,000 Implemented
UD0718 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $42,615 $44,322 Not Implemented
UD0718 # 05 Y:2005 05 2005 DEVELOP A REPAIR/REPLACE POLICY $45,734 $178,576 Not Implemented
UD0718 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $37,367 $19,721 Not Implemented
UD0718 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,025 $13,430 Not Implemented
UD0718 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $4,300 $12,500 Not Implemented
UD0718 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,805 $2,598 Not Implemented
UD0718 # 10 Y:2005 10 2005 USE POWER DURING OFF-PEAK PERIODS $2,913 $0 Not Implemented
UD0718 # 11 Y:2005 11 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,522 $3,044 Implemented
UD0718 # 12 Y:2005 12 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $762 $362 Not Implemented