IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

295

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0485 # 05 Y:2012 05 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $774 $989 Implemented
IA0485 # 04 Y:2012 04 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,683 $1,560 Not Implemented
IA0485 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,133 $1,343 Implemented
IA0485 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $688 $525 Implemented
IA0485 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $273 Implemented
IA0484 # 01 Y:2012 01 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,225 $401 Not Implemented
IA0484 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $664 $390 Not Implemented
IA0484 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $442 $1,424 Not Implemented
IA0484 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $799 Not Implemented
IA0484 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,589 $11,275 Not Implemented
IA0484 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,822 $971 Not Implemented
IA0484 # 07 Y:2012 07 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,014 $1,466 Not Implemented
IA0484 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $250 Not Implemented
IA0484 # 10 Y:2012 10 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $987 $1,009 Not Implemented
IA0484 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,537 $7,700 Not Implemented
MZ0065 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,240 $0 Not Implemented
MZ0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,106 $2,120 Implemented
MZ0065 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,078 $963 Not Implemented
MZ0065 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,073 $1,500 Implemented
MZ0065 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,566 $20,000 Not Implemented
MZ0065 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,154 $100,000 Not Implemented
MZ0065 # 04 Y:2011 04 2011 USE SOLAR HEAT TO HEAT WATER $300 $2,500 Implemented
MZ0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $3,000 Implemented
IA0420 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $19,446 $1,000 Not Implemented
IA0420 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,179 $25 Not Implemented