IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0292 # 23 Y:2004 23 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,043 $459 Not Implemented
WV0292 # 24 Y:2004 24 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,935 $5,740 Not Implemented
WV0292 # 25 Y:2004 25 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,929 $3,460 Not Implemented
WV0292 # 26 Y:2004 26 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,494 $4,715 Implemented
WV0292 # 27 Y:2004 27 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,007 $1,000 Implemented
WV0292 # 28 Y:2004 28 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,659 $2,088 Not Implemented
WV0292 # 29 Y:2004 29 2004 INSTALL OCCUPANCY SENSORS $1,497 $1,944 Not Implemented
UD0683 # 01 Y:2003 01 2003 $30,335 $50,000 Not Implemented
UD0683 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $11,700 Implemented
UD0683 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,600 $4,625 Not Implemented
UD0683 # 04 Y:2003 04 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,225 $0 Not Implemented
UD0683 # 05 Y:2003 05 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $0 Not Implemented
UD0683 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $200 $0 Not Implemented
UD0673 # 01 Y:2003 01 2003 $22,837 $8,450 Not Implemented
UD0673 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $10,820 $9,840 Implemented
UD0673 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,940 $9,945 Not Implemented
UD0673 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,738 $3,024 Implemented
UD0673 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $850 $25 Not Implemented
UD0673 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $1,591 Not Implemented
UD0673 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $390 $262 Not Implemented
UD0673 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $707 Not Implemented
WV0269 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,890 $470 Not Implemented
WV0269 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,113 $200 Implemented
WV0269 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,690 $608 Not Implemented
WV0269 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $858 $250 Implemented