Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,535
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0219 # 06 Y:1999 | 06 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $4,514 | $60 | Implemented |
OK0576 # 01 Y:1999 | 01 | 1999 | REDUCE EXCESSIVE BOILER BLOWDOWN | $11,368 | $16,000 | Not Implemented |
OK0576 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,672 | $17,813 | Implemented |
OK0576 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $140 | Implemented |
OK0576 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $228 | $68 | Not Implemented |
OK0576 # 05 Y:1999 | 05 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $22,560 | $40,000 | Implemented |
OK0576 # 06 Y:1999 | 06 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $4,518 | $3,990 | Implemented |
OK0576 # 07 Y:1999 | 07 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,939 | $5,000 | Not Implemented |
SF0165 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $535 | $889 | n/a |
SF0165 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,152 | $14,840 | n/a |
SF0165 # 03 Y:1999 | 03 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $491 | $1,250 | n/a |
SF0165 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,333 | $51,850 | n/a |
SF0165 # 05 Y:1999 | 05 | 1999 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $726 | $0 | n/a |
SF0165 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $30,000 | $2,773 | n/a |
CO0435 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $14,850 | Not Implemented |
CO0435 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,380 | $2,000 | Implemented |
CO0435 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $570 | $710 | Not Implemented |
CO0435 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $500 | Implemented |
CO0435 # 05 Y:1999 | 05 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $100 | Implemented |
CO0435 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $210 | $134 | Implemented |
CO0435 # 07 Y:1999 | 07 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $10,920 | $0 | Not Implemented |
CO0435 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,640 | $8,000 | Not Implemented |
ND0320 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $131 | $0 | Implemented |
ND0320 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $695 | $1,893 | Implemented |
ND0320 # 03 Y:1999 | 03 | 1999 | USE PHOTOCELL CONTROLS | $303 | $600 | Implemented |