Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,535
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0175 # 05 Y:1998 | 05 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $9,375 | $0 | Implemented |
HO0175 # 06 Y:1998 | 06 | 1998 | CLEAR AND RENT EXISTING SPACE | $18,000 | $3,000 | Implemented |
HO0190 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,715 | $15,311 | Not Implemented |
HO0190 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,478 | $39,600 | Not Implemented |
HO0190 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $39,503 | $85,000 | Not Implemented |
HO0190 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,524 | $2,500 | Implemented |
HO0190 # 05 Y:1999 | 05 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,100 | $360 | Implemented |
SF0156 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,764 | $144 | n/a |
SF0156 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $434 | $167 | n/a |
SF0156 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $553 | $881 | n/a |
SF0156 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $815 | $1,628 | n/a |
SF0156 # 05 Y:1999 | 05 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $9,385 | $250 | n/a |
SF0156 # 06 Y:1999 | 06 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $11,629 | $15,500 | n/a |
SF0156 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,641 | $41,432 | n/a |
OR0336 # 01 Y:1999 | 01 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $93,600 | $200,000 | Implemented |
OR0336 # 02 Y:1999 | 02 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $31,700 | $0 | Implemented |
OR0336 # 03 Y:1999 | 03 | 1999 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $27,050 | $8,200 | Not Implemented |
OR0336 # 04 Y:1999 | 04 | 1999 | OPTIMIZE PLANT POWER FACTOR | $3,716 | $10,200 | Not Implemented |
TN0647 # 01 Y:1999 | 01 | 1999 | MAKE A NEW BY-PRODUCT | $754,000 | $1,851,360 | Not Implemented |
TN0647 # 02 Y:1999 | 02 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $339,565 | $329,440 | Not Implemented |
TN0647 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $21,000 | $16,000 | Not Implemented |
TN0647 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,040 | $500 | Not Implemented |
TN0647 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $0 | Implemented |
AS0240 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,167 | $9,143 | Not Implemented |
AS0240 # 02 Y:1998 | 02 | 1998 | INSTALL SKYLIGHTS | $2,417 | $7,500 | Not Implemented |