IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,746 $3,614 Not Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0246 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,995 Not Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
MA0238 # 01 Y:1992 01 1992 USE OPTIMUM TEMPERATURE $22,238 $2,775 Not Implemented
MA0238 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,104 $0 Not Implemented
MA0238 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $11,684 $787 Not Implemented
MA0238 # 04 Y:1992 04 1992 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $10,215 $31,246 Not Implemented
MA0238 # 05 Y:1992 05 1992 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $8,950 $27,957 Not Implemented
MA0238 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,814 $2,053 Implemented
MA0238 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $2,305 $0 Implemented
MA0238 # 08 Y:1992 08 1992 MODERATE COOLING TOWER OUTLET TEMPERATURE $181 $100 Implemented
MA0238 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48 $0 Not Implemented
MA0197 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $406 $142 Implemented
MA0197 # 02 Y:1990 02 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,166 $642 Implemented
MA0197 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $10,622 Implemented
MA0197 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $5,052 Implemented
MA0197 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $972 $0 Implemented
MA0197 # 06 Y:1990 06 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,680 $927 Implemented
MA0197 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,639 $19,720 Not Implemented
MA0192 # 01 Y:1990 01 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,182 $2,878 Not Implemented