IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0430 # 06 Y:1998 06 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $56,116 $21,247 Not Implemented
MA0430 # 07 Y:1998 07 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,518 $800 Implemented
MA0430 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,048 $75 Implemented
MA0430 # 09 Y:1998 09 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,863 $15,850 Not Implemented
MA0370 # 01 Y:1996 01 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $321,166 $27,000 Not Implemented
MA0370 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,771 $146,000 Not Implemented
MA0370 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,513 $32,940 Not Implemented
MA0370 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,249 $90,000 Not Implemented
MA0370 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,599 $18,000 Not Implemented
MA0358 # 01 Y:1996 01 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,000 $2,800 Not Implemented
MA0358 # 02 Y:1996 02 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,147 $4,650 Not Implemented
MA0358 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,080 $0 Not Implemented
MA0358 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $742 $1,100 Not Implemented
MA0358 # 05 Y:1996 05 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $377 $0 Not Implemented
MA0357 # 01 Y:1996 01 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $72,723 $72,500 Not Implemented
MA0357 # 02 Y:1996 02 1996 FILTER AND REUSE HYDRAULIC OIL $13,997 $734 Not Implemented
MA0357 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $6,765 $1,200 Not Implemented
MA0357 # 04 Y:1996 04 1996 UPGRADE CONTROLS ON COMPRESSORS $4,822 $6,000 Not Implemented
MA0280 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,368 $6,769 Not Implemented
MA0280 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,602 $10,000 Not Implemented
MA0280 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $113 Not Implemented
MA0280 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $324 $64 Not Implemented
MA0280 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $602 Not Implemented
MA0280 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $415 $160 Not Implemented
MA0280 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $249 $136 Not Implemented