IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0191 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,156 $7,425 Not Implemented
OR0191 # 04 Y:1993 04 1993 OPTIMIZE PLANT POWER FACTOR $5,843 $12,300 Not Implemented
OR0191 # 05 Y:1993 05 1993 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $36,422 $41,000 Implemented
OR0191 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $8,272 $13,663 Implemented
OR0148 # 01 Y:1992 01 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $942 $0 Implemented
OR0148 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $86 $0 Implemented
OR0148 # 03 Y:1992 03 1992 MINIMIZE WATER USAGE $1,770 $574 Not Implemented
OR0148 # 04 Y:1992 04 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,487 $2,700 Implemented
OR0148 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $1,000 Implemented
OR0148 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $516 $1,090 Not Implemented
OR0148 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $228 Implemented
OR0118 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,432 $0 Implemented
OR0118 # 02 Y:1991 02 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,838 $0 Implemented
OR0118 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $3,367 $3,124 Implemented
OR0118 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $383 $919 Implemented
OR0118 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $2,040 $5,100 Implemented
OR0118 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,177 Implemented
OR0099 # 01 Y:1990 01 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $669 $50 Implemented
OR0099 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $511 $60 Implemented
OR0099 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53 $117 Not Implemented
OR0099 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $399 $1,480 Not Implemented
OR0099 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,167 $20,751 Not Implemented
OR0090 # 01 Y:1990 01 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64,713 $5,000 Implemented
OR0090 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $509 Implemented
OR0090 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $1,562 $3,277 Not Implemented