IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0431 # 06 Y:2017 06 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,655 $10,500 Not Implemented
LE0431 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,000 $9,467 Implemented
LE0431 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,098 $4,125 Not Implemented
LE0431 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $643 Implemented
LE0431 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $3,727 $1,500 Implemented
LE0431 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,440 $1,000 Implemented
LE0419 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,339 $8,602 Not Implemented
LE0419 # 07 Y:2016 07 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $41,911 $70,000 Implemented
LE0419 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,176 $61,332 Implemented
LE0419 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,235 $60,700 Not Implemented
LE0419 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,277 $63,000 Implemented
LE0419 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,202 $1,830 Implemented
LE0419 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,060 $25,900 Implemented
LE0419 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,334 $1,000 Implemented
LE0401 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,934 $24,500 Not Implemented
LE0401 # 12 Y:2015 12 2015 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $1,822 $6,360 Implemented
LE0401 # 11 Y:2015 11 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,980 $15,100 Implemented
LE0401 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $732 $1,645 Implemented
LE0401 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $179 $280 Implemented
LE0401 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $1,000 Implemented
LE0401 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,205 $1,600 Not Implemented
LE0401 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $247 $245 Implemented
LE0401 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,751 $5,000 Not Implemented
LE0401 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $582 $343 Implemented
LE0401 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,142 $3,000 Implemented