IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,317

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0192 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $942 Implemented
MA0192 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $162 $436 Implemented
MA0192 # 08 Y:1990 08 1990 INSTALL TIMERS AND/OR THERMOSTATS $436 $200 Implemented
MA0184 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $518 $0 Not Implemented
MA0184 # 02 Y:1990 02 1990 REDUCE VENTILATION AIR $12,741 $3,500 Not Implemented
MA0184 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $173 $316 Not Implemented
MA0184 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $1,410 $657 Implemented
MA0184 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $5,188 $1,277 Implemented
MA0184 # 06 Y:1990 06 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,410 $2,620 Implemented
MO0008 # 01 Y:1990 01 1990 PAY UTILITY BILLS ON TIME $2,180 $0 Implemented
MO0008 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $420 Not Implemented
MO0008 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,322 $1,990 Not Implemented
MO0008 # 04 Y:1990 04 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,214 $1,844 Not Implemented
MO0008 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $319 Implemented
MO0008 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $171 $0 Not Implemented
OR0090 # 01 Y:1990 01 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64,713 $5,000 Implemented
OR0090 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $509 Implemented
OR0090 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $1,562 $3,277 Not Implemented
OR0090 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,098 $2,400 Not Implemented
OR0090 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $687 $1,950 Not Implemented
OR0090 # 06 Y:1990 06 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,669 $22,569 Not Implemented
AM0100 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $60 Not Implemented
AM0100 # 02 Y:1990 02 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $232 $900 Not Implemented
AM0100 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $187 Implemented
AM0100 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105 $80 Not Implemented