IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,279

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0571 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $2,000 Not Implemented
SD0571 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $3,128 $939 Not Implemented
SD0571 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $20,104 $28,000 Not Implemented
SD0571 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,866 $178,055 Not Implemented
SD0560 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,307 $600 Not Implemented
SD0560 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $1,200 Implemented
SD0560 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $19,600 Implemented
SD0560 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,240 $11,880 Implemented
SD0560 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,197 $59,204 Not Implemented
SF0498 # 10 Y:2017 10 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,815 $27,742 Implemented
SF0498 # 09 Y:2017 09 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $65,652 $583,671 Not Implemented
SF0498 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,733 $56,494 Not Implemented
SF0498 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $8,507 $21,536 Implemented
SF0498 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,025 $3,196 Implemented
SF0498 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $417 $178 Implemented
SF0498 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,342 $210 Not Implemented
SF0498 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,580 $177 Implemented
SF0498 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $339 $0 Implemented
SF0498 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,101 $0 Implemented
SD0535 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $324,317 $112,783 Implemented
SD0535 # 02 Y:2016 02 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,770 $402,000 Not Implemented
SD0535 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,449 $42,926 Implemented
SD0535 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,321 $3,181 Not Implemented
SD0535 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $7,184 $6,400 Implemented
SD0535 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,708 $200 Not Implemented