IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0764 # 07 Y:2008 07 2008 REPAIR OR REPLACE STEAM TRAPS $28,620 $23,375 Not Implemented
OK0764 # 08 Y:2008 08 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $2,877 $0 Not Implemented
OK0745 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,891 $360 Implemented
OK0745 # 02 Y:2007 02 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $57,727 $3,600 Not Implemented
OK0745 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $13,884 $4,859 Implemented
OK0745 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $2,384 $744 Not Implemented
OK0745 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,437 $1,574 Not Implemented
OK0745 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,998 $9,010 Not Implemented
OK0745 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,171 $81,808 Not Implemented
OK0745 # 08 Y:2007 08 2007 OPTIMIZE PLANT POWER FACTOR $1,509 $6,760 Not Implemented
OK0745 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,516 $7,600 Not Implemented
OK0745 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $609 $3,125 Not Implemented
OK0745 # 11 Y:2007 11 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,616 $286,361 Implemented
OK0724 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $588 $322 Not Implemented
OK0724 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,492 $1,975 Not Implemented
OK0724 # 03 Y:2006 03 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,858 $4,100 Not Implemented
OK0724 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $380 $288 Not Implemented
OK0724 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $13,458 $0 Not Implemented
OK0724 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,235 $5,958 Not Implemented
OK0724 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,655 $2,592 Not Implemented
OK0724 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $169 $495 Not Implemented
OK0724 # 09 Y:2006 09 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $28,864 $61,416 Not Implemented
OK0724 # 10 Y:2006 10 2006 USE COMPRESSOR AIR FILTERS $2,647 $642 Not Implemented
OK0724 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,211 $5,963 Not Implemented
OK0722 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,766 $10,375 Not Implemented