Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0036 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,780 Not Implemented
IP0036 # 09 Y:2015 09 2015 RECOVER AND REUSE COOLING WATER $188 $120 Not Implemented
IP0036 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $240 Not Implemented
IP0033 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,557 $0 Implemented
IP0033 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,742 $240 Implemented
IP0033 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $520 $144 Not Implemented
IP0033 # 04 Y:2015 04 2015 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $4,925 $3,000 Not Implemented
IP0033 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,961 $1,864 Implemented
IP0033 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $3,232 Implemented
IP0033 # 07 Y:2015 07 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,865 $3,720 Not Implemented
IP0033 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,939 $10,200 Implemented
IP0033 # 09 Y:2015 09 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,096 $25,603 Not Implemented
IP0028 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $0 Implemented
IP0028 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $13 Implemented
IP0028 # 03 Y:2014 03 2014 INSTALL SET-BACK TIMERS $1,201 $196 Implemented
IP0028 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $147 $76 Implemented
IP0028 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $282 $357 Implemented
IP0028 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $655 $2,312 Not Implemented
IP0028 # 07 Y:2014 07 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,354 $5,025 Not Implemented
IP0024 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $16,250 $0 Implemented
IP0024 # 02 Y:2014 02 2014 APPLY FOR INVESTMENT INCENTIVES $2,460 $147 Implemented
IP0024 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,916 $284 Not Implemented
IP0024 # 04 Y:2014 04 2014 OPTIMIZE PLANT POWER FACTOR $15,670 $13,000 Not Implemented
IP0024 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $542 $603 Not Implemented
IP0024 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $1,050 Not Implemented