IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0722 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,201 $5,750 Not Implemented
OK0722 # 03 Y:2006 03 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $266 $521 Implemented
OK0722 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,193 $40 Implemented
OK0722 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $1,300 Not Implemented
OK0722 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,157 $15,330 Not Implemented
OK0722 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,066 $1,600 Not Implemented
OK0722 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,222 $67,616 Implemented
OK0722 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,795 $8,054 Implemented
OK0712 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,981 $11,356 Not Implemented
OK0712 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,669 $7,920 Not Implemented
OK0712 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $23,560 Not Implemented
OK0712 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $672 $1,820 Not Implemented
OK0712 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,800 $5,000 Not Implemented
OK0712 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $39,487 $48,800 Not Implemented
OK0712 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,142 $860 Not Implemented
OK0712 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,000 $3,000 Not Implemented
OK0712 # 09 Y:2005 09 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,026 $3,377 Not Implemented
OK0712 # 10 Y:2005 10 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,512 $660 Not Implemented
OK0712 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $1,327 Not Implemented
OK0712 # 12 Y:2005 12 2005 PAY BILLS ON TIME TO AVOID LATE FEES $7,801 $0 Not Implemented
OK0711 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,068 $25,248 Not Implemented
OK0711 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $333 $647 Not Implemented
OK0711 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,907 $3,150 Not Implemented
OK0711 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,929 $125 Not Implemented
OK0711 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Not Implemented