IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,397

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0312 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,728 $30 n/a
TT0312 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $30,815 $6,360 n/a
TT0312 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,940 $2,262 n/a
TT0312 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,292 $635 n/a
TT0312 # 06 Y:2024 06 2024 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,000 $12,000 n/a
TT0312 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,740 $11,250 n/a
TT0312 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,253 $3,000 n/a
TT0312 # 09 Y:2024 09 2024 INSTALL OCCUPANCY SENSORS $1,294 $1,860 n/a
TT0312 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,155 $4,810 n/a
SD0655 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,382 $8,850 n/a
SD0655 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,218 $7,799 n/a
SD0655 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,849 $5,725 n/a
SD0655 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,987 $2,109 n/a
SD0655 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,570 $42,732 n/a
SD0655 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $47,700 $5,600 n/a
SD0655 # 07 Y:2024 07 2024 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,721 $5,005 n/a
NT0021 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,801 $7,120 n/a
NT0021 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $19,175 $6,411 n/a
NT0021 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,153 $11,393 n/a
NT0021 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,821 $5,609 n/a
NT0021 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,130 $0 n/a
NT0021 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $16,970 $0 n/a
NT0021 # 07 Y:2024 07 2024 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $21,290 $19,507 n/a
NT0021 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $88,000 $94,845 n/a
UF0611 # 03 Y:2024 03 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $30,134 $5,900 n/a