IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0256 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $0 Not Implemented
MA0254 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $45,335 $164,025 Not Implemented
MA0254 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $35,756 $0 Not Implemented
MA0254 # 03 Y:1992 03 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,589 $31,600 Not Implemented
MA0254 # 04 Y:1992 04 1992 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $9,355 $29,200 Not Implemented
MA0254 # 05 Y:1992 05 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,908 $785 Not Implemented
MA0254 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $1,285 $320 Not Implemented
MA0254 # 07 Y:1992 07 1992 INSTALL SET-BACK TIMERS $780 $330 Not Implemented
MA0255 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $15,804 $17,400 Not Implemented
MA0255 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,470 $25 Implemented
MA0255 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,783 $3 Implemented
MA0255 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,883 $10,121 Implemented
MA0255 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,628 $400 Implemented
MA0255 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $2,122 $720 Not Implemented
MA0255 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,985 $900 Implemented
MA0255 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,734 $360 Implemented
MA0255 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $0 Implemented
MA0255 # 10 Y:1992 10 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $200 $300 Implemented
MA0255 # 11 Y:1992 11 1992 COVER OPEN TANKS $181 $285 Not Implemented
MA0236 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,284 $0 Not Implemented
MA0236 # 02 Y:1992 02 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,797 $1,500 Implemented
MA0236 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $686 $2 Implemented
MA0212 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,099 $2,649 Implemented
MA0212 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $3,090 $3,593 Implemented
MA0212 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,737 $9,055 Implemented