Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
340
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0492 # 04 Y:2005 | 04 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $5,832 | $1,000 | Implemented |
WI0492 # 05 Y:2005 | 05 | 2005 | IMPROVE LUBRICATION PRACTICES | $3,033 | $2,155 | Implemented |
WI0492 # 06 Y:2005 | 06 | 2005 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,820 | $0 | Not Implemented |
WI0492 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $1,494 | $600 | Implemented |
WI0492 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,335 | $1,280 | Implemented |
WI0492 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $665 | $800 | Not Implemented |
WI0486 # 01 Y:2005 | 01 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $20,351 | $18,000 | Not Implemented |
WI0486 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,915 | $1,280 | Implemented |
WI0486 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,600 | $7,840 | Not Implemented |
WI0486 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,465 | $0 | Implemented |
WI0486 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,086 | $780 | Implemented |
WI0486 # 06 Y:2005 | 06 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,509 | $700 | Not Implemented |
WI0486 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $671 | $300 | Not Implemented |
WI0486 # 08 Y:2005 | 08 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $453 | $800 | Implemented |
WI0483 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,449 | $18,810 | n/a |
WI0483 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,950 | $10,000 | Not Implemented |
WI0483 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,804 | $500 | Not Implemented |
WI0483 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,164 | $830 | Implemented |
WI0483 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,971 | $2,186 | Not Implemented |
WI0483 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,886 | $0 | Not Implemented |
WI0483 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $393 | $40 | Not Implemented |
WI0479 # 01 Y:2004 | 01 | 2004 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $16,108 | $12,000 | Not Implemented |
WI0479 # 02 Y:2004 | 02 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,744 | $18,000 | Not Implemented |
WI0479 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,122 | $11,520 | n/a |
WI0479 # 04 Y:2004 | 04 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,229 | $0 | Not Implemented |