Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0564 # 01 Y:2004 | 01 | 2004 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $20,000 | $0 | Not Implemented |
MA0564 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,419 | $10,531 | Not Implemented |
MA0564 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,406 | $3,226 | Not Implemented |
MA0564 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $168 | $75 | Not Implemented |
MA0564 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $548 | Implemented |
ME0282 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,760 | $8,904 | Not Implemented |
ME0282 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $12,262 | $1,000 | Implemented |
ME0282 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $80,666 | $36,000 | Implemented |
ME0282 # 04 Y:2000 | 04 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,181 | $4,360 | Not Implemented |
ME0282 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,228 | $250 | Implemented |
ME0272 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,434 | $2,159 | Implemented |
ME0272 # 04 Y:1999 | 04 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,306 | $450 | Implemented |
ME0272 # 08 Y:1999 | 08 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,172 | $5,760 | Implemented |
ME0272 # 09 Y:1999 | 09 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,760 | $7,122 | Implemented |
ME0272 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,227 | $850 | Not Implemented |
ME0272 # 11 Y:1999 | 11 | 1999 | INSULATE BARE EQUIPMENT | $1,899 | $1,260 | Implemented |
ME0272 # 10 Y:1999 | 10 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,141 | $7,579 | Not Implemented |
ME0272 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $5,265 | $0 | Implemented |
ME0272 # 01 Y:1999 | 01 | 1999 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $19,520 | $4,860 | Not Implemented |
ME0272 # 05 Y:1999 | 05 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,306 | $500 | Not Implemented |
ME0272 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,056 | $22,438 | Not Implemented |
ME0243 # 02 Y:1998 | 02 | 1998 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,765 | $3,000 | Implemented |
ME0243 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,145 | $0 | Not Implemented |
ME0243 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $972 | $1,000 | Implemented |
ME0243 # 04 Y:1998 | 04 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,194 | $0 | Implemented |