IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0663 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $191 $300 n/a
NC0663 # 03 Y:2021 03 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,320 $8,144 n/a
NC0663 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,885 $3,168 n/a
NC0620 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,305 $10,000 Not Implemented
NC0620 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $927 $1,000 Implemented
NC0620 # 04 Y:2018 04 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,184 $100,000 Not Implemented
NC0620 # 06 Y:2018 06 2018 RECOVER WASTE HEAT FROM EQUIPMENT $45,926 $200,000 Not Implemented
NC0620 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,189 $2,250 Implemented
NC0620 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,426 $100 Implemented
NC0615 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,150 $25,474 Implemented
NC0615 # 10 Y:2018 10 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $282 $50 Implemented
NC0615 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $250 $250 Not Implemented
NC0615 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $50 Not Implemented
NC0615 # 08 Y:2018 08 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,491 $3,500 Not Implemented
NC0615 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $1,380 $4,000 Not Implemented
NC0615 # 09 Y:2018 09 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,615 $500 Not Implemented
NC0615 # 07 Y:2018 07 2018 AVOID REWINDING MOTORS MORE THAN TWICE $5,240 $12,129 Implemented
NC0615 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,044 $165 Implemented
NC0615 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $197 $900 Not Implemented
NC0602 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,338 $500 Not Implemented
NC0602 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $429 $420 Not Implemented
NC0602 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $831 $3,467 Not Implemented
NC0602 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,747 $200 Not Implemented
NC0602 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $8,212 $14,854 Not Implemented
NC0602 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $184 $300 Not Implemented