IAC Assessment: NC0615
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0615
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Injection molded plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 80,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,209 3,653,062 kWh $0.04
Electricity Demand $84,314 9,201 kW-months/year $9.16
Natural Gas $282 1 MMBtu $282.00
TOTAL ENERGY COSTS $243,805
RECOMMENDED SAVINGS* $45,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,716
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,150
Cost:
$25,474
$9,053 207,636 $4,097 450 - - - - - - $9,053
207,636
kWh
$4,097
450
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$250
Cost:
$250
$250 5,740 - - - - - - - - $250
5,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,044
Cost:
$165
$853 19,553 $356 39 - - $(-90) - $(-75) - $853
19,553
kWh
$356
39
kW-months/year
-
-
MMBtu
$(-90)
-
$
$(-75)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$197
Cost:
$900
$197 4,515 - - - - - - - - $197
4,515
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$206
Cost:
$50
$145 3,330 $61 7 - - - - - - $145
3,330
kWh
$61
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,380
Cost:
$4,000
$976 22,380 $404 44 - - - - - - $976
22,380
kWh
$404
44
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$5,240
Cost:
$12,129
$3,696 84,762 $1,544 170 - - - - - - $3,696
84,762
kWh
$1,544
170
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$6,491
Cost:
$3,500
$4,578 105,000 $1,913 210 - - - - - - $4,578
105,000
kWh
$1,913
210
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$17,615
Cost:
$500
$17,615 - - - - - - - - - $17,615
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$282
Cost:
$50
- - - - $282 - - - - - -
-
kWh
-
-
kW-months/year
$282
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,855
Cost:
$47,018
$37,363 452,916 $8,375 920 $282 - $(-90) - $(-75) - $37,363
452,916
kWh
$8,375
920
kW-months/year
$282
-
MMBtu
$(-90)
-
$
$(-75)
-
$
TOTAL IMPLEMENTED Savings:
$19,716
Cost:
$37,818
$13,602 311,951 $5,997 659 $282 - $(-90) - $(-75) - $13,602
311,951
kWh
$5,997
659
kW-months/year
$282
-
MMBtu
$(-90)
-
$
$(-75)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost