IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0057 # 03 Y:2021 03 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,271 $16,980 Not Implemented
NL0057 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,345 $11,175 Implemented
NL0057 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,211 $2,500 Implemented
NL0057 # 02 Y:2021 02 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,793 $13,100 Not Implemented
NL0057 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,696 $154,720 Not Implemented
NL0057 # 05 Y:2021 05 2021 USE RADIANT HEATER FOR SPOT HEATING $4,782 $15,170 Implemented
NL0014 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $260 $225 Not Implemented
NL0014 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,200 $1,630 Implemented
NL0014 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,430 $12,500 Implemented
NL0014 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,500 Implemented
NL0014 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $0 Implemented
NL0012 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,477 $136 Implemented
NL0012 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $9,825 Implemented
NL0012 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,183 $250 Implemented
NL0012 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Not Implemented
NL0012 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $920 $980 Not Implemented
NL0012 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $582 $2,100 Not Implemented
NL0012 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $163 $157 Implemented
NL0001 # 07 Y:2017 07 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $55,600 $45,000 Implemented
NL0001 # 01 Y:2017 01 2017 UPGRADE OBSOLETE EQUIPMENT $28,978 $82,175 Not Implemented
NL0001 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $0 Not Implemented
NL0001 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,694 $17,700 Not Implemented
NL0001 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $78,000 Implemented
NL0001 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,808 $0 Not Implemented
NL0001 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $1,000 Implemented