Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0583 # 07 Y:2024 07 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $94 $52 n/a
AS0583 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,282 $4,696 n/a
AS0583 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $122 $476 n/a
AS0583 # 03 Y:2024 03 2024 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,022 $1,805 n/a
AS0583 # 02 Y:2024 02 2024 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $43,888 $15,124 n/a
AS0583 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $137 $172 n/a
AS0583 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $87,396 $642,159 n/a
SF0575 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,526 $0 Not Implemented
SF0575 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,559 $16,052 Implemented
SF0575 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,624 $18,284 Implemented
SF0575 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,642 $1,513 Implemented
SF0575 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,748 $1,047 Implemented
SF0575 # 12 Y:2021 12 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,554 $6,764 Implemented
SF0575 # 11 Y:2021 11 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,353 $19,986 Implemented
SF0575 # 09 Y:2021 09 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,137 $1,513 Implemented
SF0575 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,311 $966 Implemented
SF0575 # 02 Y:2021 02 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,510 $0 Not Implemented
SF0575 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $0 Implemented
SF0575 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $100 Not Implemented
AS0419 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,620 $1,000 Not Implemented
AS0419 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,482 $7,500 Not Implemented
AS0419 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $5,000 Not Implemented
AS0382 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $1,697 Implemented
AS0382 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $17,174 $840 Implemented
AS0382 # 08 Y:2004 08 2004 $6,306 $300 Implemented