IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
MA0592 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,191 $368,500 Not Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0592 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,861 $138,775 Not Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0455 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,701 $16,000 Not Implemented
MA0455 # 02 Y:1999 02 1999 USE MINIMUM SAFE OVEN VENTILATION $33,134 $16,250 Not Implemented
MA0455 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,496 $240,000 Not Implemented
MA0455 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,310 $50,000 Not Implemented
MA0455 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,122 $8,000 Not Implemented
MA0386 # 06 Y:1997 06 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,837 $3,215 Not Implemented
MA0386 # 05 Y:1997 05 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,800 $11,240 Not Implemented
MA0386 # 01 Y:1997 01 1997 USE OTHER METHODS FOR NEUTRALIZATION $194,188 $908,000 Not Implemented
MA0386 # 04 Y:1997 04 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,103 $20,180 Not Implemented
MA0386 # 03 Y:1997 03 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,024 $22,219 Not Implemented
MA0386 # 02 Y:1997 02 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $42,000 $0 Not Implemented
MA0180 # 01 Y:1990 01 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,523 $5,750 Implemented
MA0180 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,604 $334 Implemented
MA0180 # 03 Y:1990 03 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,957 $6,200 Not Implemented
MA0042 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,464 $200 Implemented
MA0042 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,060 $24,450 Implemented
MA0042 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $326 $280 Implemented
MA0042 # 04 Y:1985 04 1985 OPTIMIZE PLANT POWER FACTOR $9,522 $13,420 Implemented
MA0042 # 05 Y:1985 05 1985 IMPROVE LUBRICATION PRACTICES $194 $147 Not Implemented
MA0042 # 06 Y:1985 06 1985 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,886 $0 Implemented