Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0214 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,069 | $17,638 | Implemented |
UU0214 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,776 | $6,969 | Implemented |
UU0214 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,274 | $495 | Implemented |
UU0214 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $701 | $1,150 | Not Implemented |
UU0214 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $1,558 | Implemented |
UU0214 # 07 Y:2023 | 07 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,046 | $226,100 | Not Implemented |
UU0214 # 08 Y:2023 | 08 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $23,820 | $214,625 | Not Implemented |
UU0214 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,031 | $23,302 | Implemented |
UU0190 # 02 Y:2021 | 02 | 2021 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,939 | $3,000 | Not Implemented |
UU0190 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,058 | $778 | Not Implemented |
UU0190 # 04 Y:2021 | 04 | 2021 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,942 | $2,900 | Not Implemented |
UU0190 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Not Implemented |
UU0190 # 01 Y:2021 | 01 | 2021 | INSULATE BARE EQUIPMENT | $9,772 | $5,582 | Not Implemented |
UU0185 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,525 | $11,563 | Implemented |
UU0185 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,198 | $3,400 | Implemented |
UU0185 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $491 | $255 | Implemented |
UU0185 # 06 Y:2021 | 06 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,535 | $2,600 | Not Implemented |
UU0185 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,814 | $14,000 | Implemented |
UU0185 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,960 | $908 | Not Implemented |
UU0185 # 01 Y:2021 | 01 | 2021 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $21,754 | $64,000 | Not Implemented |
UU0150 # 11 Y:2019 | 11 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,570 | $1,000 | Implemented |
UU0150 # 01 Y:2019 | 01 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $20,467 | $29,138 | Implemented |
UU0150 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,605 | $15,000 | Not Implemented |
UU0150 # 05 Y:2019 | 05 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,756 | $21,565 | Not Implemented |
UU0150 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,762 | $3,762 | Not Implemented |