Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
442
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0144 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,456 | $0 | Not Implemented |
LE0144 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,579 | $1,000 | Not Implemented |
LE0144 # 03 Y:2002 | 03 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,820 | $9,600 | Not Implemented |
LE0144 # 05 Y:2002 | 05 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $636 | $0 | Not Implemented |
LE0144 # 04 Y:2002 | 04 | 2002 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $968 | $0 | Not Implemented |
SF0249 # 06 Y:2002 | 06 | 2002 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $50,830 | $54,425 | Not Implemented |
SF0249 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,090 | $7,975 | Not Implemented |
SF0249 # 10 Y:2002 | 10 | 2002 | INSULATE BARE EQUIPMENT | $3,436 | $9,800 | Implemented |
SF0249 # 08 Y:2002 | 08 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $365 | $750 | Not Implemented |
SF0249 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,508 | $0 | Implemented |
SF0249 # 03 Y:2002 | 03 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,151 | $1,893 | Not Implemented |
SF0249 # 12 Y:2002 | 12 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $38,019 | $150 | Implemented |
SF0249 # 11 Y:2002 | 11 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,555 | $166,322 | Not Implemented |
SF0249 # 05 Y:2002 | 05 | 2002 | USE PHOTOCELL CONTROLS | $5,440 | $3,960 | Not Implemented |
SF0249 # 13 Y:2002 | 13 | 2002 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,560 | $9,550 | Implemented |
SF0249 # 14 Y:2002 | 14 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $76,360 | $160,000 | Not Implemented |
SF0249 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $595 | $366 | Not Implemented |
SF0249 # 02 Y:2002 | 02 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $9,751 | $0 | Implemented |
SF0249 # 09 Y:2002 | 09 | 2002 | REDUCE FLUID FLOW RATES | $3,021 | $7,646 | Not Implemented |
TA0042 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $305 | $160 | Not Implemented |
TA0042 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,610 | $800 | Implemented |
TA0042 # 04 Y:2002 | 04 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $3,860 | $0 | Implemented |
TA0042 # 01 Y:2002 | 01 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $54,420 | $0 | Implemented |
TA0042 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,470 | $0 | Implemented |
IA0308 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $0 | Not Implemented |