Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
385
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0012 # 05 Y:1994 | 05 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,888 | $2,000 | Not Implemented |
UM0012 # 06 Y:1994 | 06 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $615 | $500 | Not Implemented |
UM0012 # 07 Y:1994 | 07 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,836 | $0 | Implemented |
AM0220 # 01 Y:1994 | 01 | 1994 | OPTIMIZE PLANT POWER FACTOR | $96,105 | $145,000 | Implemented |
AM0220 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $44,845 | $120,000 | Implemented |
AM0220 # 03 Y:1994 | 03 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $37,861 | $92,046 | Implemented |
AM0220 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,620 | $3,800 | Implemented |
AM0220 # 05 Y:1994 | 05 | 1994 | INSTALL OCCUPANCY SENSORS | $12,915 | $6,250 | Implemented |
AM0220 # 06 Y:1994 | 06 | 1994 | WASH AND REUSE RAGS ON-SITE | $2,070 | $7,900 | Implemented |
AM0220 # 07 Y:1994 | 07 | 1994 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $670 | $2,400 | Implemented |
KU0443 # 11 Y:1994 | 11 | 1994 | COMBINE UTILITY METERS | $156 | $10 | Implemented |
KU0443 # 10 Y:1994 | 10 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $759 | $180 | Implemented |
KU0443 # 09 Y:1994 | 09 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,645 | $150 | Implemented |
KU0443 # 08 Y:1994 | 08 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,178 | $174 | Implemented |
KU0443 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $465 | $299 | Implemented |
KU0443 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $441 | $752 | Implemented |
KU0443 # 05 Y:1994 | 05 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,484 | $11,400 | Implemented |
KU0443 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,287 | $13,432 | Not Implemented |
KU0443 # 03 Y:1994 | 03 | 1994 | INSTALL SKYLIGHTS | $5,343 | $14,940 | Not Implemented |
KU0443 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,623 | $31,141 | Implemented |
KU0443 # 01 Y:1994 | 01 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $76,353 | $131,600 | Not Implemented |
SD0096 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,182 | $22,260 | Implemented |
SD0096 # 02 Y:1994 | 02 | 1994 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,252 | $73,354 | Not Implemented |
SD0096 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,565 | $0 | Not Implemented |
SD0096 # 04 Y:1994 | 04 | 1994 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $90,168 | $27,490 | Not Implemented |