IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

701

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0451 # 08 Y:1999 08 1999 ADJUST VENTS TO MINIMIZE ENERGY USE $228 $600 Not Implemented
MA0451 # 07 Y:1999 07 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $500 $2,675 Not Implemented
MA0451 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $985 Not Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
MA0451 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,798 $50,000 Not Implemented
MA0451 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,519 $11,400 Not Implemented
MA0451 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,232 $7,614 Not Implemented
MA0451 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $3,400 Not Implemented
UL0226 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $92,078 $100,203 Not Implemented
UL0226 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,020 $522 Implemented
UL0226 # 03 Y:1999 03 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,134 $0 Implemented
UL0226 # 04 Y:1999 04 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $433 $930 Implemented
KU0531 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $8,350 $9,600 Not Implemented
KU0531 # 02 Y:1999 02 1999 USE SYNTHETIC LUBRICANT $2,350 $3,690 Not Implemented
KU0531 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,670 Not Implemented
KU0531 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,370 $110 Not Implemented
KU0531 # 05 Y:1999 05 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $600 $0 Not Implemented
KU0531 # 06 Y:1999 06 1999 $91,030 $325,000 Not Implemented
NC0175 # 09 Y:1999 09 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,133 $1,000 n/a
NC0175 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,172 $200 n/a
NC0175 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,920 $500 n/a
NC0175 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,424 $500 n/a
NC0175 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,727 $5,500 n/a
NC0175 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,887 $8,000 n/a
NC0175 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,698 $3,000 n/a