IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0295 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $423 $0 Implemented
BD0295 # 01 Y:2005 01 2005 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $32,765 $600 Implemented
BD0295 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,254 $8,470 Implemented
BD0295 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,391 $900 Implemented
BD0295 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,487 $3,000 Implemented
BD0295 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,724 $0 Implemented
BD0295 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $14,253 $2,875 Implemented
SD0371 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,914 $648 Not Implemented
SD0371 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,559 $55,084 Not Implemented
SD0371 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $31,048 $0 Not Implemented
SD0371 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,113 $52 Not Implemented
SD0371 # 02 Y:2005 02 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $17,251 $3,850 Not Implemented
SD0371 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,329 $6,950 Not Implemented
SD0371 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,944 $12,000 Not Implemented
SD0371 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $140 Implemented
TA0101 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $800 $85 Implemented
TA0101 # 01 Y:2005 01 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,313 $0 Implemented
TA0101 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,480 $190 Implemented
TA0101 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,970 $0 Implemented
TA0101 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,140 $0 Implemented
TA0101 # 05 Y:2005 05 2005 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,595 $0 Implemented
TA0101 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $665 $200 Implemented
TA0101 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $395 $100 Implemented
TA0101 # 09 Y:2005 09 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $275 $0 Not Implemented
TA0101 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $255 $360 Implemented