IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0374 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,667 $200 Not Implemented
UM0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $10,900 Implemented
UM0374 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $93 Implemented
NC0412 # 09 Y:2010 09 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $91,232 $255,000 Not Implemented
NC0412 # 08 Y:2010 08 2010 $1,000,000 $2,000,000 Not Implemented
NC0412 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,402 $1,200 Implemented
NC0412 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,349 $13,200 Not Implemented
NC0412 # 05 Y:2010 05 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $7,153 $15,100 Implemented
NC0412 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $2,841 $4,995 Implemented
NC0412 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $100 Implemented
NC0412 # 02 Y:2010 02 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $25,289 $50 Implemented
NC0412 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140,256 $442,314 Implemented
CO0638 # 01 Y:2010 01 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,090 $1,490 Not Implemented
CO0638 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,160 $3,710 Not Implemented
CO0638 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $5,490 $14,380 Not Implemented
CO0638 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,860 $30,940 Not Implemented
CO0638 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,800 $15,890 Not Implemented
CO0638 # 06 Y:2010 06 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,800 $20,470 Not Implemented
CO0638 # 07 Y:2010 07 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,910 $35,000 Not Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Implemented
LE0301 # 01 Y:2010 01 2010 REPLACE BOILER $284,580 $500,000 Not Implemented
LE0301 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0301 # 11 Y:2010 11 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,938 $3,000 Not Implemented
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented