Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

351

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0492 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,544 $585 Implemented
IA0492 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,344 $720 Implemented
IA0492 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $755 $1,617 Implemented
IA0492 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $914 $490 Not Implemented
IA0492 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,082 $105 Not Implemented
IA0492 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $590 Not Implemented
IA0492 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $35 Not Implemented
SF0425 # 01 Y:2013 01 2013 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,713 $0 Implemented
SF0425 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,421 $7,471 Implemented
SF0425 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,974 $5,906 Not Implemented
SF0425 # 04 Y:2013 04 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,255 $2,240 Not Implemented
SF0425 # 05 Y:2013 05 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $30,904 $9,885 Not Implemented
SF0425 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $7,235 Implemented
SF0425 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $3,416 $13,849 Implemented
SF0425 # 08 Y:2013 08 2013 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $692 $2,830 Implemented
WV0460 # 11 Y:2013 11 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $737 $829 Implemented
WV0460 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $1,725 Implemented
WV0460 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $936 $10,030 Implemented
WV0460 # 08 Y:2013 08 2013 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,354 $6,500 Not Implemented
WV0460 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,232 $18 Implemented
WV0460 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $2,480 $2,088 Not Implemented
WV0460 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $2,734 Not Implemented
WV0460 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $7,221 $553 Implemented
WV0460 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,833 $27,115 Not Implemented
WV0460 # 02 Y:2013 02 2013 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,224 $1,000 Implemented