Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0909 # 05 Y:2017 | 05 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $49,838 | $321,120 | Implemented |
GT0909 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,255 | $36,180 | Implemented |
NL0014 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,100 | $0 | Implemented |
NL0014 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,430 | $12,500 | Implemented |
NL0014 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $9,200 | $1,630 | Implemented |
NL0014 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,804 | $2,500 | Implemented |
LE0444 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,628 | $5,580 | Implemented |
LE0444 # 10 Y:2017 | 10 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,541 | $6,960 | Implemented |
LE0444 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,107 | $30 | Implemented |
LE0444 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $917 | $30 | Implemented |
LE0444 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $110,990 | $170,000 | Implemented |
LE0444 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,762 | $46,000 | Implemented |
LE0444 # 11 Y:2017 | 11 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $233,480 | $1,905,000 | Implemented |
MI0323 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,440 | $49,900 | Implemented |
MI0323 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,478 | $51,292 | Implemented |
MI0323 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,856 | $2,800 | Implemented |
MI0323 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,380 | $1,660 | Implemented |
MI0323 # 08 Y:2017 | 08 | 2017 | USE SOLAR HEAT TO HEAT WATER | $1,635 | $1,500 | Implemented |
MI0323 # 06 Y:2017 | 06 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,290 | $7,150 | Implemented |
UD0975 # 03 Y:2017 | 03 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $17,029 | $68 | Implemented |
UD0975 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,179 | $0 | Implemented |
UD0975 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,148 | $47,000 | Implemented |
UD0975 # 09 Y:2017 | 09 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,684 | $1,500 | Implemented |
UD0975 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,640 | $1,600 | Implemented |
UD0975 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,600 | $0 | Implemented |