IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0795 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $100,737 $184,800 Not Implemented
MA0795 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $2,512 Implemented
MA0795 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $6,779 $911 Not Implemented
MA0795 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,287 $200 Not Implemented
LE0465 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,973 $50,000 Not Implemented
LE0465 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,594 $73,000 Not Implemented
LE0465 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,416 $1,000 Implemented
LE0465 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $19,292 Implemented
LE0465 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,928 $260,000 Not Implemented
MI0343 # 02 Y:2018 02 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $37,140 $43,838 Not Implemented
MI0343 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,044 $2,973 Not Implemented
MI0343 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,421 $1,005 Not Implemented
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented
MI0343 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $30,500 $3,280 Implemented
WV0566 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $1,217 $3,150 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,643 $5,200 Not Implemented
WV0566 # 10 Y:2018 10 2018 INSULATE BARE EQUIPMENT $114 $180 Implemented
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented
WV0566 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,590 $114,000 Not Implemented