IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

346

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0214 # 08 Y:2023 08 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,820 $214,625 Not Implemented
OK1085 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,249 $820,666 Not Implemented
OK1085 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,853 $0 Implemented
OK1085 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,322 $2,730 Implemented
OK1085 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $15,984 $2,567 Implemented
OK1085 # 05 Y:2023 05 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $564 $0 Implemented
TT0285 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,659 $129,000 Not Implemented
TT0285 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,051 $12,000 Not Implemented
TT0285 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,920 $13,000 Implemented
TT0285 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,364 $55,000 Not Implemented
TT0285 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,293 $3,600 Implemented
TT0285 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,020 $33,675 Not Implemented
TT0285 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,451 $1,225 Implemented
TT0285 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $616 $2,793 Implemented
DL0215 # 01 Y:2023 01 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $29,690 $0 Not Implemented
DL0215 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $125,900 $30,000 Not Implemented
DL0215 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $222,700 $184,000 Implemented
DL0215 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,640 $3,000 Implemented
DL0215 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $131,800 $250,000 Not Implemented
DL0215 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,033 $38,000 Not Implemented
DL0215 # 07 Y:2023 07 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,998 $52,900 Not Implemented