IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

381

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0745 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $13,884 $4,859 Implemented
OK0745 # 11 Y:2007 11 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,616 $286,361 Implemented
GT0835 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,131 $1,172 Implemented
GT0835 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $750 Implemented
WV0354 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $14,128 $900 Implemented
WV0354 # 05 Y:2007 05 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,489 $1,000 Implemented
WV0354 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,629 $0 Implemented
WV0354 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,596 $32 Implemented
WV0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $0 Implemented
WV0354 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,190 $408 Implemented
WV0354 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $857 $504 Implemented
LL0267 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $23,653 $3,315 Implemented
LL0267 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,794 $1,280 Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
GT0801 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,040 $32,725 Implemented
GT0801 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72 $0 Implemented
GT0801 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $500 Implemented
GT0801 # 07 Y:2005 07 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,100 $15,000 Implemented
WI0486 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,086 $780 Implemented
WI0486 # 08 Y:2005 08 2005 INSTALL TIMERS AND/OR THERMOSTATS $453 $800 Implemented
WI0486 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $0 Implemented
WI0486 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,915 $1,280 Implemented