IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

932

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
BD0291 # 01 Y:2005 01 2005 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $126,274 $320,000 Not Implemented
BD0291 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $18,984 $17,000 Not Implemented
BD0291 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,444 $2,886 Not Implemented
BD0291 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,415 $13,500 Not Implemented
BD0291 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,030 $2,850 Not Implemented
BD0291 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $6,678 $1,000 Not Implemented
BD0291 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,582 $11,250 Not Implemented
BD0291 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,134 $2,200 Not Implemented
BD0291 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,677 $0 Not Implemented
BD0291 # 10 Y:2005 10 2005 USE RADIANT HEATER FOR SPOT HEATING $2,257 $2,500 Not Implemented
BD0291 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,162 $2,000 Not Implemented
BD0291 # 12 Y:2005 12 2005 INSTALL OCCUPANCY SENSORS $1,620 $2,000 Not Implemented
BD0291 # 13 Y:2005 13 2005 PAY BILLS ON TIME TO AVOID LATE FEES $3,744 $2,500 Not Implemented
BD0291 # 14 Y:2005 14 2005 AUTOMATE PAYROLL SYSTEM $2,950 $0 Not Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
GT0801 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,040 $32,725 Implemented
GT0801 # 02 Y:2005 02 2005 USE PHOTOCELL CONTROLS $7,520 $32,480 Not Implemented
GT0801 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72 $0 Implemented
GT0801 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $500 Implemented
GT0801 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,820 $500 Not Implemented