IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1054 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $500 Implemented
UD1054 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Not Implemented
UD1009 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $100,517 $151,300 Not Implemented
UD1009 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,116 $0 Implemented
UD1009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,826 $1,000 Implemented
UD1009 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $78,282 $44,250 Not Implemented
UD1009 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,717 $4,388 Implemented
UD1009 # 05 Y:2020 05 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $107,302 $83,000 Implemented
UD1009 # 07 Y:2020 07 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $73,844 $147,736 Not Implemented
WV0012 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53 $916 Implemented
WV0012 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,050 $1,800 Not Implemented
WV0012 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $170 Implemented
WV0012 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,915 $3,200 Not Implemented
WV0012 # 05 Y:1993 05 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $758 $570 Implemented
WV0012 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,687 $1,500 Implemented
UD0035 # 05 Y:1982 05 1982 REDUCE VENTILATION AIR $180 $150 Not Implemented
UD0035 # 04 Y:1982 04 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,768 $1,700 Implemented
UD0035 # 03 Y:1982 03 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,933 $2,000 Not Implemented
UD0035 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $258 Implemented
UD0035 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $70 $150 Implemented