IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

924

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0053 # 03 Y:1986 03 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $250 Not Implemented
MA0053 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,047 $190 Not Implemented
MA0053 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,381 $30 Not Implemented
MA0053 # 06 Y:1986 06 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $25,584 $22,400 Not Implemented
MA0053 # 07 Y:1986 07 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,447 $7,700 Not Implemented
MA0053 # 08 Y:1986 08 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,022 $35,300 Not Implemented
MA0020 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,592 $6,000 Implemented
MA0020 # 02 Y:1985 02 1985 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,754 $56,300 Implemented
MA0020 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $4,696 $13,000 Not Implemented
MA0020 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $100 Implemented
MA0014 # 01 Y:1985 01 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,022 $2,622 Implemented
MA0014 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,281 $384 Not Implemented
MA0014 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $329 $186 Implemented
MA0014 # 04 Y:1985 04 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $9,947 $3,050 Implemented
GT0216 # 01 Y:1984 01 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,648 $500 Implemented
GT0216 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,006 $967 Implemented
GT0216 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,352 $5,000 Not Implemented
GT0216 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,561 $127 Not Implemented
GT0216 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $150 Implemented
UD0035 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $70 $150 Implemented
UD0035 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $258 Implemented
UD0035 # 03 Y:1982 03 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,933 $2,000 Not Implemented
UD0035 # 04 Y:1982 04 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,768 $1,700 Implemented
UD0035 # 05 Y:1982 05 1982 REDUCE VENTILATION AIR $180 $150 Not Implemented